Yuhuan Huanyang

Yuhuan Huanyang HY02D211B-T / HY02D223B Wiring Example

 

 

 


INFORMATION: As VFDs have different control parameters, the VFD must first be properly configured to accept 0–10V control signals. Wiring the VFD alone will not allow it to operate with the controller.